Selasa, 03 Januari 2012

Comparison of Brick and Hebel (lightweight concrete)

Today the building materials of the replacement brick beragam.Mulai increasingly using Hebel or changed using the cover plate floors are made from lightweight and to the roof no longer use wood as a horse â "a horse or for battens and usuknya, but the current trend of people using a steel ringa as a substitute for wood.

For the walls, old people tend to use a brick or stone bata.namun now people are familiar with Hebel (lightweight concrete). Actually, lightweight concrete has been used by Swedish society in 1923 as an alternative building materials to reduce deforestation in 1943 hutan.Kemudian diJerman further developed by Joseph hebel. And in Indonesia itself Hebel began to be known since 1995.

Or Hebel lightweight concrete material for the batter among others, consists of quartz sand, cement, lime, a little gypsum, water, and aluminum paste as a developer (air filler chemically). Once the dough is mixed perfectly, will be expanded for 7-8 hours. Aluminum pastes used in the mixture, in addition to functioning as a developer he was instrumental in influencing the hardness of concrete. Aluminum paste volume is around 5-8 percent of the dough is made, depending on the desired density. The dough is then aerated concrete is cut to size.

As for brick brick brick types consists of clay or loam, sand lime bricks, mortar and brick. Meanwhile, in terms of manufacture, there is a conventional red bricks and brick press.

Gambar 1. Proses pembuatan batu bata
For terms of the size of bricks 25 x 12 x 4.5 cm or smaller in a few centimeters. For Hebel usual size 20 x 60 x 10 cm or smaller thickness can sedikit.Dalam penggunanan brick wall used as a cover approximately 85 buah.Sedang for Hebel average â "average use of 8.5 units.

Gambar 2. Pemasangan hebel yang memerlukan waktu lebih cepat
When viewed in terms of price for a single brick ranges from USD 375, - / buahnya.Untuk Hebel Rp 650.000, - / m3. So that the average unit price â "average of Rp. 6500, - / fruit. Thus, in a large brick 1m2 to cost USD 375, - x 85 = Rp. 31 875, - (outside of the speci). And to Hebel in 1m2 is Rp. 6500, - x 8.5 = Rp. 55 250, - (outside of the speci). Indeed for Hebel falling prices higher. But in terms of weight for structured, Hebel lighter and faster process.

1 komentar: